Upgrade

Space planning and material upgrades for existing residences. No structural work.

Upgrade is the Design service for a residence that has good bones and dated finishes. The building is right. The location is right. The layout is livable. What the space lacks is the material quality, storage resolution, and lighting intelligence that it should have had from the start — or that the intervening decades have rendered obsolete.

Tier Options

Design

Space planning, material specification, and systems integration. Everything fixed to the building that is not structural.

Investment Range: Starting at 10% of the property value

Project Duration: 6 - 12 months

Scope: Complete home design with enhanced functionality without major structural changes

 

Perfect for:

  • Homes requiring comprehensive space optimization
  • Properties needing layout improvements and flow enhancement
  • Investment properties requiring strategic positioning for maximum market appeal

Improvement

Complete design layer for new construction and high-end properties requiring full system integration.

Full smart home design and integration, bespoke built-in library, bar, and storage solutions, home gym, home theater, outdoor garden and terrace, and complete personalization of kitchen and primary batch over develop specification. Every system designed under one specification.

Explore Improvement

Investment

InvestmentStarting at 10% of property value
Timeline4–6 months
Notes

Timeline includes board approval where required (4–8 weeks) plus construction phase. Material lead times for custom cabinetry and stone are typically 10–14 weeks.

In Detail

We begin with a full space planning review. In our experience, apartments that have been lived in for years frequently contain layout improvements that require no structural work — a wall removed, a doorway shifted, a galley kitchen opened to the living room. These are design decisions, not construction decisions, and they belong at the start of the process, not as afterthoughts.

What's Included

Overview: Comprehensive space planning, material selection, and installation for existing spaces that need upgrading rather than reconfiguring. Kitchen and bathroom renovation, flooring, lighting, built-in storage — without moving walls or relocating plumbing stacks.

Scope Details:

  • Space planning: layout and flow resolved before any material selection begins
  • Kitchen renovation: new cabinetry, countertops, appliances, fixtures — within existing footprint
  • Bathroom renovation: new tile, fixtures, vanity, lighting — within existing footprint
  • Flooring: refinishing existing hardwood or full replacement
  • Lighting design as a complete system: ambient, task, accent, and controls — not individual fixtures
  • Built-in storage designed to the specific life of the household
  • Smart home integration as infrastructure (optional at this tier)
  • Material specification: stone, tile, paint, hardware throughout
  • Board approval management where required
  • Construction oversight and trade coordination

The Process

Process Methodology

  • Space First: We resolve layout and flow before any material is selected. The single most common design failure in renovation is selecting beautiful materials for a floor plan that doesn't work. Space planning is not decorating — it is the structural logic of how a home functions.
  • Lighting System: Lighting design at this tier is a complete system specification: ambient layers, task layers, accent layers, and a control system that manages them. We do not specify light fixtures — we specify a light program. The fixture selection happens within the program framework.
  • Storage Intelligence: Built-in storage is designed to the specific household: the number of people, the nature of their collections, the actual dimensions of what gets stored. Standard cabinetry dimensions exist for manufacturing convenience, not for how anyone actually lives.
  • Board Management: Where board approval is required, we manage the full process: documentation, alteration agreement, managing agent relationship, and board meeting preparation if required.

Process by Subservice

Design

10–20%+ of property value4–12 months

Improvement

Starting at 10% of property value6–12 months
Systems Scoping2–3 weeks

Smart home scope confirmed. AV requirements mapped. Outdoor and specialty space requirements defined. Contractor and trade team assembled before design begins.

Integrated Design6–8 weeks

All systems designed together: interior design, lighting, smart home, AV, outdoor. The coordination happens in design, not during construction.

Documentation and Coordination3–4 weeks

Complete construction documents including all system specifications. Trade coordination to ensure systems are compatible before rough-in begins.

Construction and Installation12–20 weeks

Phased construction with weekly coordination across all trades. Smart home rough-in and infrastructure before finish work. Systems commissioning and programming at completion.

Handover and Training1–2 weeks

Systems commissioned and tested. Client training on smart home, AV, and specialty systems. Punch list resolved. Documentation package delivered.

Ideal For

The Client

A client in an existing residence who wants to upgrade quality and functionality without the cost or disruption of structural work. Common situations: new purchase of a unit with dated finishes, existing resident who wants to modernize without moving, investment property being prepared for sale or rental.

Active Neighborhoods: All 10 neighborhoods — active across entire Manhattan portfolio

Not A Fit If

If you need to move walls, combine spaces, or reconfigure the structural relationship of rooms, this is Home Renovation territory.

Tier Evolution

Home Upgrade clients often expand scope to Home Improvement when they realize the value of integrating smart home, outdoor, or entertainment systems. We typically present both tiers during the initial brief.

Building Requirements

Applicable Architecture

Pre-war co-ops: board approval required, HVAC often prohibited, plumbing relocation requires structural drawings. Glass towers and new condominiums: more permissive process, modern systems ready for integration. Lofts: plumbing chase planning is critical before layout is confirmed.

Six SubservicesCuration • Bespoke • Upgrade • Improvement • Remodeling • Renovation